BCS SD03 speed dome 66 Manual de instalación Pagina 19

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 25
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 18
Teflon tape
M4 Screw
Silica gel
Figure 2-21
Please loosen the M4 bolt at the splicing sleeve of pole bottom (just a little will be
O.K), then turn the screw thread of the upper cover splicing sleeve in. Now pull the
power cable through the upper cover and then turn the upper cover to the pole
splicing sleeve firmly. Fix the M4 bolt. Loosen the captive screw in the panel. See
Figure 2-22.
Please note, if the speed dome is installed in outdoor environment, please enlace
enough Teflon tape at the screw thread of pole and then turn the pole to the
connection flange firmly.
Please use silica gel to secure waterproof between pole connection splicing
(coupling) sleeve and the connection port.
Please refer to Figure 2-22 to loosen captive screw and then open panel.
M4 Screw
Teflon tape
Figure 2-22
Cable connection: Please refer to Figure 2-5.
Bottom cover connection: Please refer to Figure 2-8.
19
Vista de pagina 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 25

Comentarios a estos manuales

Sin comentarios